    How to Fit an ADU Into Your Existing Site Plan

    By Brent Bohrer•October 31, 2026•Updated October 31, 2026•11 min read

    Quick answer

    Place the ADU before detailed design: map the legal building envelope, utilities, septic areas, access and drainage together. Then test entrances, windows and the remaining yard for both households. For qualifying detached units, SB 284 caps assigned parking at two spaces for units at least 650 square feet and one for smaller units.

    On the first site walk, the useful question is not where the cottage would look best in a rendering. It is where a second dwelling can sit without taking away the access, drainage, privacy and outdoor space that make the main house work. Draw that answer on the site plan before committing to room layouts.

    Start with the parcel boundaries, the actual position of the house and the routes that already serve it. Then add the constraints that are easy to miss from the patio: a sewer crossing the proposed foundation, an easement at the rear fence, a septic replacement area under the lawn, or an electrical service that cannot carry the proposed load. These are placement decisions before they are finish decisions.

    The sequence is simple: establish the permitted envelope, trace services and drainage, preserve access, and test how both households will use the lot. This guide describes that first walk, not a universal setback chart. Utah lots differ by jurisdiction, zoning district, recorded restrictions and utility provider. A site-specific dimension belongs on the measured plan, not in an assumed statewide rule.

    What space remains after the main house uses its envelope?

    An ADU competes with the main house for the lot's permitted building area. Setbacks, maximum coverage and height determine how much of the apparent open yard is actually available. The fence is not proof of the legal boundary, and an existing shed is not proof that a dwelling can occupy the same location.

    Mark the property lines and applicable setbacks first. Show the main house, garage, covered areas and other structures that count toward coverage under the local rules. Subtract those from the permitted coverage before choosing an ADU footprint. A narrow side yard can look vacant while being almost entirely inside a required setback or easement.

    Height needs its own check. A unit above a garage may preserve ground-level yard while introducing a taller wall, overlook into nearby windows and a more demanding stair route. On a slope, the way height is measured can affect the building's position as much as its roof shape. A compact footprint is not automatically an easier approval.

    On a suburban lot, the best rectangle on paper often sits where the house already relies on light, circulation or a patio. Do not treat the maximum permitted footprint as a design target. Draw a smaller option alongside it and compare the remaining yard and walking routes. The usable envelope is the overlap of legal permission and a property that still functions.

    Where do sewer and water reach the proposed dwelling?

    Trace the actual sewer and water routes before placing a foundation. A connection near the main house may be convenient, but the pipes' depth, condition and available capacity determine whether the proposed connection works. Do not infer a line's location from a meter or a patch in the lawn.

    For sewer, identify the existing connection, direction of flow, cleanouts and elevations. The new drain must reach an approved connection with a workable fall or a designed alternative. A cottage downhill from the existing connection can create a very different drainage problem from one uphill. A long route across the yard also affects excavation, restoration and access during construction.

    For water, identify the meter, service size, pressure conditions and the path to the new unit. Adding a kitchen, bathroom and laundry changes demand. The utility provider's service requirements and the plumbing design determine whether the existing service can support that demand or needs alteration. A nearby hose bib is not a second dwelling's water-service plan.

    Draw utility corridors on the same plan as the building. Keep access to cleanouts, valves and meters. Show where a trench would cross existing paving or mature planting, and whether it would have to pass beneath the proposed structure. Moving the building while it is a rectangle on paper can avoid an awkward connection that a finished floor plan would force.

    Can the electrical panel and gas service support the new loads?

    An empty breaker position does not establish electrical capacity. The proposed cooking, heating, cooling, water heating and laundry loads need to be considered with the main house's existing loads. Service equipment, feeder routing and the utility's connection requirements belong in early planning.

    Write down the equipment strategy before design advances. An all-electric unit, a gas-heated unit and one sharing selected systems create different routes and loads. The decision is not merely which appliance the owner likes. It determines where mechanical equipment sits, how the service reaches it and what space must stay accessible.

    If gas is proposed, map the existing line and review demand and sizing for the additional equipment. If a service upgrade is required, identify the meter or equipment location and the provider's access needs before locating the ADU entrance or patio. Avoid designing a carefully composed courtyard that becomes the only place service equipment can go.

    Mechanical equipment has neighbors too. Place outdoor units where they can be serviced without crossing a private patio, and consider their proximity to sleeping windows. Utility planning is part of how the two dwellings live together, not something to hide after the architecture is approved.

    Why does septic planning come before a detached footprint?

    On a septic-served property, wastewater capacity and approved disposal areas can control the ADU's position more than the available lawn does. The tank is only one part of the system. Existing drain fields, required separations, access and replacement areas must remain protected.

    Find the approved septic records and show those areas on the site plan. The proposed dwelling adds wastewater demand, and the proposed wastewater arrangement needs to satisfy the applicable health requirements before the dwelling proceeds. An existing system serving the main house is not automatically sized or approved for the additional accommodation.

    A soil evaluation or percolation test may be required as part of that review. Soil conditions, groundwater, slope and the available disposal area determine which system designs are feasible. Utah's Onsite Wastewater Program and the local health department are the sources for the soil-evaluation and system-approval process; those program pages could not be verified for linking. No assumption that an unused corner of the lot is suitable replaces a site evaluation.

    Keep building foundations, paving and grading out of protected wastewater areas. A driveway that appears to solve access can occupy the space needed for a replacement field. A retaining wall can change the ground conditions around it. Resolve those conflicts together before the unit's foundation or driveway is drawn as a finished design.

    How do driveway access and parking fit without taking over the lot?

    Show the vehicle route and the walking route separately. A parking rectangle is not sufficient if a car must block the main home's garage, cross the only patio or reverse through a space used by the other household. Test the arrangement with both households present, not with the yard empty.

    Under Utah's SB 284 detached-ADU provisions, a specified municipality cannot require more than two on-site spaces assigned to an ADU of at least 650 square feet, or more than one assigned space for a smaller ADU. These are assigned ADU spaces, not a universal two-space cap for the entire property. The law also permits replacement of required main-home spaces lost through a detached-garage conversion. Read the official detached-ADU parking requirements. Internal units have their own rules. The parking figure sets a limit on what can be required, not a recommendation to pave the whole remaining yard.

    Keep a practical route from parking to the entrance. Consider groceries, steps, snow clearing and deliveries. If the ADU is for a relative with changing mobility needs, decide whether the route can remain useful without forcing that household through the main home's living spaces. The approach should feel like access to a dwelling, not a service path past equipment and bins.

    Do not assume a new curb cut or shared driveway change is permitted. Show the existing approved access and any proposed alteration in the application. Vehicle space, fire access and utility access are overlapping constraints, and a parking cap does not replace their review.

    Which windows and entrances preserve privacy for both homes?

    Locate the entrance and principal windows before finalizing the rooms. An ADU living-room window directly opposite the main home's bedroom can make both spaces less comfortable. A small rotation, offset or change in room arrangement can resolve that relationship while the design is still flexible.

    Look beyond the lot as well. Mark neighboring windows, decks and outdoor seating that are visible from the proposed unit. An upper-level window can create a sightline that a ground-level sketch misses. Walk the route to the entrance and notice whose private space a visitor would pass.

    Use orientation and layout first, rather than relying entirely on a future fence or planting. Put circulation or a less-private room where the difficult sightline occurs; give the principal living spaces a more independent outlook. Screening can support that arrangement, but it should not be the only reason the two dwellings work.

    Reserve useful outdoor space for the main home and a clear threshold for the ADU. The result need not split the yard into equal pieces. It does need to avoid one household's only outdoor seating being on the other's constant walking route. Draw the remaining spaces with furniture and paths, not just a green label reading yard.

    Will the proposal read as an addition or as an outbuilding?

    The physical relationship to the main house affects both the applicable approval path and how the finished property feels. An attached unit shares a building relationship; a detached unit creates a second building and the space between them. Calling a dwelling a studio or shed does not change its actual use or facilities.

    For an attached option, consider the connection to the existing roof, walls and entrance. The new accommodation should not make the main house's front door ambiguous or remove its useful circulation. For a detached option, test the distance and sightlines between buildings, utility connections and the character of the courtyard they create.

    Recorded HOA restrictions also matter. Utah's protection against association construction rules for compliant internal ADUs does not give detached buildings the same blanket protection. If the proposed detached use is prohibited by the applicable covenants, a well-composed site plan does not remove that restriction.

    Architecturally, a coherent property does not require the ADU to pretend to be part of the main house. It needs a deliberate relationship: roof scale, openings, materials and landscape that do not compete awkwardly. That is a design judgment about the finished setting, not a claim about resale value.

    Where will water go after grading changes?

    Trace surface water before drawing retaining walls or setting a finished floor level. On a sloped lot, placing a foundation can interrupt an existing drainage route or create a low point between the two buildings. The grading plan must keep runoff away from both dwellings and manage it through an approved route.

    Record spot elevations, existing retaining walls, visible drainage paths and downspout outlets. Show the proposed floor, patio and access elevations together. A flat-looking pad can require excavation on one side and fill on the other, changing wall heights, steps and the way water moves across the yard.

    Do not send new runoff toward a neighbor or rely on the space beneath a walkway to solve a drainage problem. The civil and structural design must address the site's conditions, including any retaining work and subsurface drainage required for the proposal. Snow storage and meltwater also need a practical destination that does not block the entrance.

    What should be settled before the first drawing set?

    Decide placement before detailed architectural drawings. A site plan is not the leftover task after choosing a floor plan from a catalog. It is the first test of whether that floor plan belongs on this property.

    • The measured boundaries, legal envelope and recorded restrictions.
    • The main house's remaining coverage, daylight, access and outdoor space.
    • Utility routes, capacity questions and service-equipment locations.
    • Septic approval and protected disposal areas where applicable.
    • Parking, pedestrian approach and practical winter access.
    • Entrances, windows and privacy relationships on and beyond the lot.
    • Floor elevations, retaining work and drainage routes.

    These constraints are inexpensive to compare on paper and expensive to untangle after a detailed design is committed. A misplaced window can be shifted early. A foundation over a utility route or a driveway over a protected drain-field area can unravel the arrangement. The first site walk should leave a workable placement strategy and a list of unresolved facts, not simply a preferred cottage shape.

    For the separate construction-budget and legal overview, see ADU costs and current Utah rules. For the distinction between useful space and financial assumptions, see what ADU resale and appraisal evidence actually shows.

    Sources

    • Utah State Legislature, detached-ADU requirements effective October 1, 2026
    • Utah State Legislature, association rules affecting compliant internal ADU construction
    • Utah DEQ Onsite Wastewater Program and local health department septic guidance: detailed program pages unavailable for live verification, left unlinked
    Share
    M

    Modern International Builders

    Utah's premier custom home builder, specializing in luxury residences throughout Park City, Alpine, Highland, and Draper. With over 20 years of experience, we transform visions into exceptional living spaces.

    Learn more about our team →

    Frequently Asked Questions

    How much lot do I need for an ADU?
    Lot area alone does not establish a workable location. The qualifying detached-ADU state provisions address lots of 11,000 square feet or more in specified municipalities; local permissions can differ. Available coverage, setbacks, access, services and the main home’s remaining outdoor space determine what actually fits.
    Can I put an ADU on a septic system?
    Septic service does not automatically rule out an ADU, but the existing system is not automatically suitable for added wastewater demand. Establish the approved capacity, disposal areas and applicable health-review process. A soil evaluation or percolation test may be required; keep foundations and paving clear of protected system areas.
    Do I need extra parking?
    For qualifying detached ADUs, SB 284 caps required assigned spaces at two for a unit of at least 650 square feet and one for a smaller unit. The law permits replacement of required main-home spaces lost through detached-garage conversion. Internal units have separate rules, and access still has to work.
    How close can the ADU be to the property line?
    The answer is the applicable setback for the parcel, building configuration and jurisdiction, not a single statewide distance. Mark measured boundaries, easements and the permitted envelope before choosing the footprint. Height, coverage, fire-safety requirements and recorded restrictions can further constrain the placement.
    Will an ADU ruin my back yard?
    A poorly placed building can remove the main home’s useful outdoor space. Compare more than one footprint and draw the remaining yard with seating, walking routes and privacy relationships. Locate windows and entrances early so neither household’s private space becomes the other’s main circulation route.
    What should I decide before design?
    Settle the placement strategy first: boundaries and restrictions, remaining coverage, utility routes and capacity, septic feasibility, parking and walking access, privacy, floor elevations and drainage. Resolve the facts that control those choices before detailed room plans make a conflicting building position difficult to change.